Road Closures Sat 3 – Mon 5 Oct

Road Closures for Gangnam Festival 2026

Closure period: Sat 3 – Mon 5 October 2026 Dosan-daero area

For the Gangnam Festival 2026 Grand Parade and main events, roads around Dosan-daero will be closed from Saturday 3 October to Monday 5 October. Traffic near the festival site may be restricted or delayed during this period. Please avoid driving and use public transport, such as the subway, wherever possible.

At a glance

  • Sat 3 Oct, all day — the stretch from the southern end of Yeongdong-daero to Hakdong Intersection runs on 6 lanes instead of 12.
  • Sat 3 Oct, 14:00–20:00 — during the Grand Parade, the parade-direction lanes between Cheongdam and Hakdong Intersections are closed.
  • Sat 3 Oct 00:00 – Mon 5 Oct 05:00 — Hakdong Intersection to Dosan Park Intersection is fully closed in both directions.
  • Bus routes and stops along Dosan-daero may be temporarily suspended or diverted.

Parade staging area — partial closure

Sat 3 October, 00:00 – 24:00 Southern end of Yeongdong-daero – Cheongdam Intersection – Hakdong Intersection
  • Six lanes on one side of the centre line are closed for the parade procession and staging.
  • Traffic runs in both directions on the remaining six lanes.
  • Because 12 lanes are reduced to 6, congestion is expected to be heavier than usual.
  • If you are travelling through this area, please take an alternative route or use public transport.

Grand Parade route — partial closure

Sat 3 October, 14:00 – 20:00 Cheongdam Intersection – Hakdong Intersection
  • The lanes in the parade direction are closed while the Grand Parade is under way.
  • The six lanes on the opposite side stay open for two-way traffic.
  • During the parade, temporary congestion and delays may occur as the procession moves.
  • Drivers are advised to use alternative routes or public transport.

Main festival venue — full closure

Sat 3 October 00:00 – Mon 5 October 05:00 Hakdong Intersection – Dosan Park Intersection
  • All lanes in both directions are closed while the main festival venue is built and operated.
  • General traffic and buses cannot pass during this period.
  • One emergency-access lane is kept open for people using facilities near the venue.
  • Closures are lifted progressively after the festival ends, with full reopening by 05:00 on Monday 5 October.

Closure maps

Tap a map to open it larger.

All three closures at a glanceSections ①②③ and their times on one diagram

The time-based maps below cover Saturday 3 October only. On Sunday 4 and Monday 5 October, the full closure described in ③ (Hakdong Intersection – Dosan Park Intersection) remains in place until it is fully lifted at 05:00 on Monday 5 October.

The maps are supplied in Korean. Key landmarks, west to east: Dosan Park Intersection (도산공원사거리), Hakdong Intersection (학동사거리), Cheongdam Intersection (청담사거리) and the Yeongdong Bridge south junction (영동대교 남단 교차로).

Main vehicle routesSurrounding roads and detour directions
Closure plan by time · Sat 3 Oct, 00:00–14:00Parade staging area, partial closure
Closure plan by time · Sat 3 Oct, 14:00–20:00During the Grand Parade

At Cheongdam and Hakdong Intersections, crossing traffic is managed by hand signals during the parade; it can cross freely before and after the parade.

Closure plan by time · Sat 3 Oct, 20:00–24:00After the parade

Bus information

  • Because of the closures, bus routes and stops serving the Sinsa Station direction on Saturday 3 October and Dosan-daero between Hakdong Intersection and Dosan Park Intersection on Saturday 3 and Sunday 4 October may be temporarily suspended or diverted.
  • Diversion details will be announced on board the buses in advance.
  • On festival days, traffic guides and on-site staff will be stationed at major stops and closure points.